Utility-scale solar construction
From open site to finished solar plant.
We mobilise onto the site, organise the work fronts and deliver the scope to design — through to handover documentation.
- 01
- Utility-scale projects, not rooftop installations
- 02
- Working inside the investor’s or main contractor’s structure
- 03
- Scope and interfaces agreed before mobilisation
Scope
Construction scope, split into stages
Stages combine into a package matched to the project and to the scope split agreed with the main contractor.
-
Site preparation and earthworks
Bringing the site to a condition that allows installation works to start, in line with the site layout design.
-
Fencing, roads and drainage
The supporting infrastructure that determines site access during construction and later operation.
-
Piling and mounting structures
Foundations and the load-bearing structure under the modules, to the documentation and design tolerances.
-
Module installation
Installing photovoltaic modules onto the prepared structure, following module handling rules.
How we run a project
Four stages that keep delivery in order
The same path on every project, whatever its size, so the client knows what to expect at each stage.
-
01
Mobilisation
Taking over the work front, setting up site facilities and haul roads, agreeing site access rules and the scope split with the other contractors.
-
02
Execution
Work delivered to the construction design and the programme, with continuous front coordination and progress reporting.
-
03
Quality control
Inspections at the stages that close out an element, checklists tied to the scope, and observations recorded and closed.
-
04
Handover
Punch list closed out, complete as-built documentation, and formal handover of the scope.
Projects
We present projects only on confirmed data
Project cards are filled in once we have data from the client and clearance to publish it. No rounded capacities, no borrowed photography.
See how we present projectsSafety and quality
Quality comes from organisation, not from a final inspection
Scope broken into stages, inspections written into the programme, and one observation register. All of that is set up before work starts, not after.
-
Scope planning
The scope split into stages and work fronts, with control points agreed before mobilisation.
-
Inspections and checklists
Checklists tied to the type of work, completed at the closing stage rather than from memory at the end.
-
Observation workflow
Inspection findings and punch-list items kept in one register, each with an owner and a date.
-
Documentation
Documentation produced alongside the work, so handover is not a reconstruction of site history.
Built for utility scale
What actually matters on a large project
On a large-footprint plant the technology is rarely the problem. Coordination of work fronts, documentation and schedule predictability are.
- Coordination
- Agreed interfaces with the other contractors and a clear scope split where the works meet.
- Documentation
- As-built documents produced in parallel with the work, ready at handover.
- Programme
- Progress reported against the programme, with risks flagged early.
- Reporting
- An agreed report format and frequency, so the client never has to chase the status of the works.
Before mobilisation
What is worth having ready before the first plant arrives
The things whose absence most often pushes a start date back by weeks. Not all of them are ours — which is exactly why we raise them early rather than on site.
-
Construction design
The version we will actually build to, with an unambiguous revision number. Two versions in circulation means rework.
-
Setting out
Row axes and control points marked on the ground. Without them piling has nothing to start from.
-
Site access
A haul road that can take heavy transport, and an agreed entrance. The surprise is usually not the road but its bearing capacity.
-
Scope split
Who owns fencing, who owns roads, who owns drainage. An interface without an owner is the most common cause of standing time.
-
Delivery schedule
Dates for structures and modules. Work fronts are planned around deliveries, not the other way round.
-
Facilities and utilities
Space for site facilities, storage and waste collection. Agreed once, at the start.
If one of these is not in place yet, that is not an obstacle to talking — it is the reason to start.
Contact
Describe the project — we will answer specifically
Location, intended scope and schedule window are enough for us to assess a possible role in delivery.